Feedback form
Q1. Proposed new overhead line between Bonnybridge and Glenmavis
We are proposing to build a new 275/400kV overhead line between our substation at Bonnybridge and a point near Glenmavis, where it will join on to an existing overhead line.
The new overhead line will be carried on steel towers (pylons) with a standard height of 46 metres. Each tower will have three arms on each side, and each arm will carry a set of conductors (wires).
Do you have any comments on our preferred route for the overhead line or the alternatives we considered?Q2. Existing overhead line between Denny North and Bonnybridge
We are proposing to uprate one side of the existing overhead line (known as ZG Route) between our substations at Denny North and Bonnybridge from 275kV to 400kV.
Do you have any comments about this proposed uprating?Q3. Are there any other issues you would like us to consider?
If 'other', please specify:
Q5. Please give us your views about the consultation process.
About you
Please provide the information requested below.
If yes, which one:
Personal details
SP Energy Networks is committed to respecting your privacy and will comply with all applicable data protection and privacy laws.
We’re consulting you to get your views on the Denny to Wishaw Network Upgrade, so we may need to share your information with certain other bodies for the purposes of the consultation and for creating reports. These are: other ScottishPower Group companies; third party service providers, contractors or advisors who provide services to us; the Scottish Government; and relevant local planning authorities.
Please tick the box below if you would like to receive updates when there is project news: